Year of signing the Agreement on opening a credit line
DBK participation
Region
Industry
amount of funding, million tenge
Action
1
Construction of a fruit processing plant
Almaty region
Agricultural sector
2
Construction of a factory for deep processing of chicken eggs with a capacity of 7,900 tons per year
Akmola region
Agricultural sector
3
Construction of an integrated agro-industrial complex for deep processing of grain and leguminous crops in Kazakhstan
Astana city
Agricultural sector
4
Vertically integrated export-oriented meat production complex
Abay region
Agricultural sector
5
Construction of a greenhouse complex with an area of 8 hectares, with a vegetable warehouse and engineering infrastructure, located at: Almaty region, Talgar district, Panfilovsky village, Panfilov village, uch.sq. 200
Almaty region
Agricultural sector
6
Export agro-industrial cluster "Shardara" in Shardara district, Turkestan region, Republic of Kazakhstan
Turkestan region
Agricultural sector
7
Construction and operation of a multidisciplinary hospital with 630 beds in Kokshetau
Akmola region
Healthcare
8
Construction of a multidisciplinary hospital with a polyclinic in Almaty
Almaty city
Healthcare
9
Construction of a heavy machinery plant in Atyrau region
Atyrau region
Mechanical engineering
10
Construction and operation of a full-cycle automobile plant for the production of vehicles
Almaty city
Mechanical engineering
11
Construction of Oil Extraction Plant in the Free Economic Zone Qyzyljar, North-Kazakhstan Region, Petropavlovsk City
North Kazakhstan region
Agricultural sector
12
A plant for the production of 110 and 220 kV voltage class power transformers in Shymkent. I queue
Shymkent city
Mechanical engineering
13
Construction of a heat exchange equipment plant in Atyrau
Atyrau region
Mechanical engineering
14
Reconstruction of the Balkhash zinc plant for processing substandard copper concentrates
Karaganda region
Metallurgical industry
15
Copper mining and production at the Tesiktas deposit
Karaganda region
Metallurgical industry
16
Construction of an polyethylene production plant
Atyrau region
Petrochemistry and oil refining
17
Construction of a high-tech hydrometallurgical plant
Pavlodar region
Metallurgical industry
18
Industrial development of polymetallic ores of the Shalkiya deposit in the Kyzylorda region with the construction of an enrichment plant
Kyzylorda region
Metallurgical industry
19
Development of an oil and gas field and construction of a gas processing plant
Atyrau region
Petrochemistry and oil refining
20
Construction of a hydrometallurgical plant for the production of nickel sulfate at the Bogetkol deposit in the village of Aitekebi in the Aktobe region of the Republic of Kazakhstan
Aktobe region
Metallurgical industry
21
Construction of a modern metallurgical plant for the production of low-alloy special purpose steels
Karaganda region
Metallurgical industry
22
Construction of a processing plant for processing man-made mineral formations in the village Verkhneberezovka, East Kazakhstan region (without external engineering networks)
East Kazakhstan region
Metallurgical industry
23
Construction and operation of a ferrosilicon production plant in Ekibastuz, Pavlodar region
Pavlodar region
Metallurgical industry
24
Installation of a Complex Gas Processing Unit With a Capacity of 1000,000,000 nm3/Year at the Kashagan Field of Atyrau Region
Atyrau region
Petrochemistry and oil refining
25
Construction and operation of a plant for the production of pressed aluminum alloy profiles with an annual output of 2000-6000 tons of profiles per year
Astana city
Production of building materials
26
Clinker production plant (clinker bricks) in Akmola region
Akmola region
Production of building materials
27
Establishment of a baby food production company KAZFOOD in the Republic of Kazakhstan
Aktobe region
Food industry
28
Construction of the Caspian Pipe Plant in the Mangistau region
Mangistau region
Production of building materials
29
Construction of woodworking production in the North Kazakhstan region
North Kazakhstan region
Production of building materials
30
Road rehabilitation investment project
Interregional project
Construction, reconstruction, repair, toll traffic and maintenance of highways
31
Construction of a factory for deep processing of chicken eggs
Akmola region
Food industry
32
Construction of a plant of fiber cement panels with a capacity of 1 million m2, in the Almaty region, IZ «Kairat»
Astana city
Production of building materials
33
Construction, reconstruction, major and medium repairs of highways with road maintenance equipment
Interregional project
Construction, reconstruction, repair, toll traffic and maintenance of highways
34
Construction of a plant for the production of glass containers in Kyzylorda
Kyzylorda region
Production of building materials
35
Construction of a longitudinally welded pipes plant
Mangistau region
Production of building materials
36
Plant for the production of ceramic products in Karaganda, Karaganda region
Karaganda region
Production of building materials
37
Construction of the highway «Rudny city bypass» in Kostanay region, length of 17 km
Kostanay region
Construction, reconstruction, repair, toll traffic and maintenance of highways
38
Construction of the industrial and production complex PK«Altyn Taga» LLP for the production of reinforced concrete products in the Almaty region
Almaty region
Production of building materials
39
Construction of a longitudinally welded pipes plant
Astana city
Production of building materials
40
Acquisition of high-performance computing infrastructure
Astana city
Transport, logistics, communications
41
Modernization of the Central Asia Center main gas pipeline
West Kazakhstan region
Transport, logistics, communications
42
Construction of the third border railroad crossing on the Kazakhstan-China border with access to the existing railroad section Semey-Aktogay - Ayagoz-Bakhty railroad line with dry port construction
Abay region
Transport, logistics, communications
43
Construction of a sulfuric acid plant with a capacity of 800 thousand tons per year in the village Taikonur, Turkestan region
Turkestan region
Chemical industry
44
Construction of the Meliora by Vignette Collection hotel with a restaurant and a fitness center in Almaty
Almaty city
Tourism
45
Organization of activities of the VISTA LAGO recreational complex on Lake Sadyrkol
East Kazakhstan region
Tourism
46
Export operation
Republic of Uzbekistan
The financial sector
47
Comprehensive reconstruction of Karaganda International Airport
Karaganda region
Transport infrastructure
48
Construction of a group water pipeline to provide drinking water to populated areas of the Turkestan region with a cascade of hydroelectric power stations on the Ugam River
Turkestan region
Transport infrastructure
49
Creation of the tourist and recreational center «Kaskasu» by 2023 in Tolebi district of Turkestan region
Turkestan region
Tourism
50
Construction of Multifunctional Hotel & Tourist Complex. Phase II in the Warm Beach area, Aktau, Mangystau region. Hotel and Tourist Complex
Mangistau region
Tourism
51
Construction of a Sodium Cyanide Production Plant in SEZ Khimpark Taraz With a Capacity of 25,000 Tons Per Year
Zhambyl region
Chemical industry
52
Construction of a Mineral Fertilizer Plant in Zhambyl Region with a Capacity of 150,000 Tons Per Year
Zhambyl region
Chemical industry
53
Construction of a Soda Ash Plant in Kyzylorda Region With a Capacity of 300 Thous Tons Per Year
Kyzylorda region
Chemical industry
54
Construction and operation of a 1GW wind power plant with an energy storage system in the area of Mirny, Zhambyl region
Zhambyl region
Energy
55
Construction of Lepsy hydroelectric power station of 15 MW
Zhetysu region
Energy
56
Construction of a combined cycle gas plant in Zhezkazgan
Ulytau region
Energy
57
Construction of the cascade of Merke HPP-5, HPP-6, HPP-7 on the Merke River in Zhambyl region
East Kazakhstan region
Energy
58
Construction of the cascade of Merke HPP-5, HPP-6, HPP-7 on the Merke River in Zhambyl region
Zhambyl region
Energy
59
Construction of a plant for the production of technical gases, electricity, oils, etc. by Circular-M LLP in the North Kazakhstan region
North Kazakhstan region
Energy
60
Construction of a 150 MW wind farm in Baidibek district of Turkestan region
Turkestan region
Energy
61
Issue of a bank guarantee of the Development Bank of Kazakhstan JSC for the project "Construction of a combined cycle gas plant with a capacity of 160 MW in Aktau, Mangystau region"
Mangistau region
Energy
62
Implementation of the 1st stage of the 1 GW Renewable Energy Project: 60 MW Kazatomprom SPP and 185 MW KEGOK SPP
Turkestan region
Energy
63
Expansion of Shakhtinskaya CHP in Shakhtinsk by the construction of a gas turbine power plant
Karaganda region
Energy
64
Construction of the Balkhash solar power plant with a capacity of 30 MW
Karaganda region
Energy
65
Construction of a 340 MW renewable power plant in the Southern Zone
Turkestan region
Energy
66
Modernisation of the 220.95 MW wind farm in Akmola region
Akmola region
Energy
67
Reconstruction of Almaty CHP-3
Almaty city
Energy
68
Construction of a Balkhash Power Station With a Capacity of 50 MW in Balkhash, Karaganda Region (Stage II)
Karaganda region
Energy
69
Construction of the Radisson Turkistan hotel in Almaty
Almaty city
Tourism
70
Multifunctional educational and health complex "AQUALINA RESORT"
Mangistau region
Tourism
71
Closed-cycle poultry complex for the production and processing of broiler meat (3rd stage)
Almaty region
Agricultural sector
72
Construction of the Hilton hotel in Almaty
Almaty city
Tourism
73
Construction of a university multidisciplinary hospital with 900 beds and a clinical diagnostic center for 700 visits per shift in Shymkent
Shymkent city
Healthcare
74
Construction of a power plant based on a combined cycle gas plant with a maneuverable generation mode with a total capacity of up to 1000 MW
Turkestan region
Energy
75
Construction of private schools by Farabi International School
Interregional project
Education
76
Construction and operation of a multidisciplinary hospital in the city of Kosshy with a capacity of 1,000 visits per day
Akmola region
Healthcare
77
Construction and procurement of sea water
Intercountry
Transport infrastructure
78
Modernization and reconstruction of electrical networks and equipment
Zhetysu region
Housing and communal services
TOTAL:
0
Construction of a fruit processing plant
Borrower
Qazaq Global Food JV LLP
Beneficiaries
Doszhanov Ergali
Region
Almaty region
Industry
Agricultural sector
Application status
Collection of documents to the stage of Banking expertise
Construction of a factory for deep processing of chicken eggs with a capacity of 7,900 tons per year
Borrower
Kaz Eggs LLP
Beneficiaries
Bozhko Maxim
Region
Akmola region
Industry
Agricultural sector
Application status
Collection of documents to the stage of Indicative analysis
Construction of an integrated agro-industrial complex for deep processing of grain and leguminous crops in Kazakhstan
Borrower
Kazak Protein LLP
Beneficiaries
Ahmet Tiryakioglu, Suleiman Tiryakioglu
Region
Astana city
Industry
Agricultural sector
Application status
Collecting documents for the stage Indicative analysis
Vertically integrated export-oriented meat production complex
Borrower
Private company EMA Ltd.
Beneficiaries
Nogaev Ayukhan
Region
Abay region
Industry
Agricultural sector
Application status
At the stage of Indicative analysis
Construction of a greenhouse complex with an area of 8 hectares, with a vegetable warehouse and engineering infrastructure, located at: Almaty region, Talgar district, Panfilovsky village, Panfilov village, uch.sq. 200
Borrower
Alatau Green Production LLP
Beneficiaries
Firuza Perzadayeva
Region
Almaty region
Industry
Agricultural sector
Application status
At the stage of Banking expertise
Export agro-industrial cluster "Shardara" in Shardara district, Turkestan region, Republic of Kazakhstan
Borrower
AGRIQA Asia LLP
Beneficiaries
Stybaev Serzhan
Region
Turkestan region
Industry
Agricultural sector
Application status
Collection of documents to the stage of Banking expertise
Construction and operation of a multidisciplinary hospital with 630 beds in Kokshetau
Borrower
RenEll Kokshetau LLP
Beneficiaries
Rönesans Holding
Region
Akmola region
Industry
Healthcare
Application status
Approved
Construction of a multidisciplinary hospital with a polyclinic in Almaty
Borrower
Selin Invest LLP
Beneficiaries
Kapatsinskaya Yelena Igorevna
Region
Almaty city
Industry
Healthcare
Application status
Collecting documents for the stage of Indicative analysis
Construction of a heavy machinery plant in Atyrau region
Borrower
Nur Astana-2007 LLP
Beneficiaries
Balapashov Amandyk Berikovich
Region
Atyrau region
Industry
Mechanical engineering
Application status
Collection of documents for the stage Banking expertise
Construction and operation of a full-cycle automobile plant for the production of vehicles
Collection documents to the stage Indicative analysis
Construction of a hydrometallurgical plant for the production of nickel sulfate at the Bogetkol deposit in the village of Aitekebi in the Aktobe region of the Republic of Kazakhstan
Construction of a modern metallurgical plant for the production of low-alloy special purpose steels
Borrower
KAZAKHSTAL LLP
Beneficiaries
Denis Leonidovich Hegai, Partner Plus Firm LLP (Founder S.V. Pavlinger)
Region
Karaganda region
Industry
Metallurgical industry
Application status
Collection of documents for the stage Banking expertise
Construction of a processing plant for processing man-made mineral formations in the village Verkhneberezovka, East Kazakhstan region (without external engineering networks)
Borrower
Rich Land Int LLP
Beneficiaries
Biguzin Abdykarim Kairbekovich
Region
East Kazakhstan region
Industry
Metallurgical industry
Application status
Collection of documents for the stage Banking expertise
Construction and operation of a ferrosilicon production plant in Ekibastuz, Pavlodar region
Borrower
Mineral Product International LLP
Beneficiaries
Kan Konstantin Alexandrovich, Kan Sergey Vladimirovich, Ibraeva Marina Leonidovna
Region
Pavlodar region
Industry
Metallurgical industry
Application status
Approved
Installation of a Complex Gas Processing Unit With a Capacity of 1000,000,000 nm3/Year at the Kashagan Field of Atyrau Region
Borrower
GPC Investment LLP
Beneficiaries
SI Committee of State Property and Privatization under the Ministry of Finance of the Republic
Region
Atyrau region
Industry
Petrochemistry and oil refining
Application status
Approved
Construction and operation of a plant for the production of pressed aluminum alloy profiles with an annual output of 2000-6000 tons of profiles per year
Borrower
Luxal Aluminum Profile Factory LLP
Beneficiaries
Kushnir Tatyana
Region
Astana city
Industry
Production of building materials
Application status
At the stage of the Indicative Analysis
Clinker production plant (clinker bricks) in Akmola region
Plant for the production of ceramic products in Karaganda, Karaganda region
Borrower
QAZCLINKER LLP
Beneficiaries
Smagulov Daulet Smagulovich
Region
Karaganda region
Industry
Production of building materials
Application status
At the stage of Banking expertise
Construction of the highway «Rudny city bypass» in Kostanay region, length of 17 km
Borrower
NC «KazAutoZhol» JSC
Beneficiaries
Government of the Republic of Kazakhstan
Region
Kostanay region
Industry
Construction, reconstruction, repair, toll traffic and maintenance of highways
Application status
Preparation of documents for the stage of Banking expertise
Construction of the industrial and production complex PK«Altyn Taga» LLP for the production of reinforced concrete products in the Almaty region
Borrower
«Altyn Taga» LLP
Beneficiaries
Orynbayev Miras Bakytovich
Region
Almaty region
Industry
Production of building materials
Application status
Approved
Construction of a longitudinally welded pipes plant
Borrower
BERTYS MACHINERY LLP
Beneficiaries
Almurat Kalybaev
Region
Astana city
Industry
Production of building materials
Application status
Аpproved
Acquisition of high-performance computing infrastructure
Borrower
National Information Technologies JSC
Beneficiaries
Government of Republic of Kazakhstan
Region
Astana city
Industry
Transport, logistics, communications
Application status
Collection of documents for the stage Banking expertise
Modernization of the Central Asia Center main gas pipeline
Borrower
Intergas Central Asia JSC
Beneficiaries
Government of the Republic of Kazakhstan
Region
West Kazakhstan region
Industry
Transport, logistics, communications
Application status
Collection of documents for the stage of Indicative analysis
Construction of the third border railroad crossing on the Kazakhstan-China border with access to the existing railroad section Semey-Aktogay - Ayagoz-Bakhty railroad line with dry port construction
Borrower
GlobalTrans Company LLP
Beneficiaries
Pavlinger Roman
Region
Abay region
Industry
Transport, logistics, communications
Application status
Collection of documents for the stage of Indicative analysis
Construction of a sulfuric acid plant with a capacity of 800 thousand tons per year in the village Taikonur, Turkestan region
Borrower
Taiqonyr Qyshqyl Zauyty LLP
Beneficiaries
Artykbayev Nurlan
Region
Turkestan region
Industry
Chemical industry
Application status
Approved
Construction of the Meliora by Vignette Collection hotel with a restaurant and a fitness center in Almaty
Borrower
KIG Stroy LLP
Beneficiaries
Kasanov Murat Ziyatdinovich
Region
Almaty city
Industry
Tourism
Application status
Collection of documents for the stage Banking expertise
Organization of activities of the VISTA LAGO recreational complex on Lake Sadyrkol
Borrower
VISTA LAGO LPP
Beneficiaries
Shakenova Zhanna Myrzakhanovna
Region
East Kazakhstan region
Industry
Tourism
Application status
Collection documents for the stage Indicative analysis
Export operation
Borrower
PJSCB "Orient Finance"
Beneficiaries
Polatov Saken
Region
Republic of Uzbekistan
Industry
The financial sector
Application status
Approved
Comprehensive reconstruction of Karaganda International Airport
Construction of a group water pipeline to provide drinking water to populated areas of the Turkestan region with a cascade of hydroelectric power stations on the Ugam River
Borrower
Ocean Energy Company LLP
Beneficiaries
Ontustik Financial Commercial and Industrial Corporation LLP (Seitzhanov family), EAST INDUSTRY COMPANY Ltd LLP (Bazarbekuly Baglan and Kozhabekov Nurlan Bazarbekovich)
Region
Turkestan region
Industry
Transport infrastructure
Application status
Collection of documents for the stage Banking expertise
Creation of the tourist and recreational center «Kaskasu» by 2023 in Tolebi district of Turkestan region
Collection of documents for the stage Banking expertise
Construction of Multifunctional Hotel & Tourist Complex. Phase II in the Warm Beach area, Aktau, Mangystau region. Hotel and Tourist Complex
Borrower
TETHYS AKTAU I LLP
Beneficiaries
mr. Fettah Tamince
Region
Mangistau region
Industry
Tourism
Application status
At the stage of Banking expertise
Construction of a Sodium Cyanide Production Plant in SEZ Khimpark Taraz With a Capacity of 25,000 Tons Per Year
Borrower
AltynAlmas Reagents LLP
Beneficiaries
Igor Vetiul, Bakhrom Burkhonovich Jalolov, Vladimir Viktorovich Jumanbayev, Diyar Bakhytbekovich Kanashev, Kairat Karibayevich Rakhishov, Gouden Reserves B.V.
Region
Zhambyl region
Industry
Chemical industry
Application status
Approved
Construction of a Mineral Fertilizer Plant in Zhambyl Region with a Capacity of 150,000 Tons Per Year
Borrower
ASIACHEM LLP
Beneficiaries
Kanat Kairzhanovich Kanafin
Region
Zhambyl region
Industry
Chemical industry
Application status
Collection of documents for the stage «Banking expertise»
Construction of a Soda Ash Plant in Kyzylorda Region With a Capacity of 300 Thous Tons Per Year
Borrower
AralSoda LLP
Beneficiaries
Dauren Mukashev
Region
Kyzylorda region
Industry
Chemical industry
Application status
At the stage of Banking expertise
Construction and operation of a 1GW wind power plant with an energy storage system in the area of Mirny, Zhambyl region
Borrower
Aktas Energy LLP
Beneficiaries
Total Eren S.A
Region
Zhambyl region
Industry
Energy
Application status
At the stage of Business proposal
Construction of Lepsy hydroelectric power station of 15 MW
Borrower
MT & K LLP
Beneficiaries
Omasheva Anna
Region
Zhetysu region
Industry
Energy
Application status
Collecting documents for the stage Banking expertise
Construction of a combined cycle gas plant in Zhezkazgan
Borrower
Kazakhmys Energy LLP
Beneficiaries
Kim Vladimir Sergeevich, Ogai Eduard Viktorovich
Region
Ulytau region
Industry
Energy
Application status
Collecting documents for the stage Indicative analysis
Construction of the cascade of Merke HPP-5, HPP-6, HPP-7 on the Merke River in Zhambyl region
Borrower
KALZHYR RIVER ENERGY LLP
Beneficiaries
Kussainov Aigazy Amirlanovich
Region
East Kazakhstan region
Industry
Energy
Application status
Collecting documents for the stage Indicative analysis
Construction of the cascade of Merke HPP-5, HPP-6, HPP-7 on the Merke River in Zhambyl region
Borrower
Taraz Green Power Genco LLP
Beneficiaries
Boguslavsky Evgeny Lvovich, Kim Yuri Gennadievich,Dosmukhambetov Chingiz Temerkanovich
Region
Zhambyl region
Industry
Energy
Application status
At the stage of Banking expertise
Construction of a plant for the production of technical gases, electricity, oils, etc. by Circular-M LLP in the North Kazakhstan region
Borrower
Circular-M LLP
Beneficiaries
Tortkara Shyngyskhan
Region
North Kazakhstan region
Industry
Energy
Application status
At the stage Business offer
Construction of a 150 MW wind farm in Baidibek district of Turkestan region
Borrower
New Clean Energy LLP
Beneficiaries
Private company «South wind Ltd», beneficiary – Nakipbekov Nurzhan Nurlanovich
Region
Turkestan region
Industry
Energy
Application status
At the stage of Indicative analysis
Issue of a bank guarantee of the Development Bank of Kazakhstan JSC for the project "Construction of a combined cycle gas plant with a capacity of 160 MW in Aktau, Mangystau region"
Borrower
Mangystau Nuclear Power Plant LLP
Beneficiaries
The state institution "Department of Finance of the Mangistau region"
Region
Mangistau region
Industry
Energy
Application status
Collection of documents for the stage Indicative analysis
Implementation of the 1st stage of the 1 GW Renewable Energy Project: 60 MW Kazatomprom SPP and 185 MW KEGOK SPP
Borrower
Altyn Dala Energy Ltd. Private company
Beneficiaries
Dzhaparov Ulan Bolotbekovich
Region
Turkestan region
Industry
Energy
Application status
Collecting documents for the stage Banking expertise
Expansion of Shakhtinskaya CHP in Shakhtinsk by the construction of a gas turbine power plant
Collection of documents for the stage of Indicative analysis
Modernisation of the 220.95 MW wind farm in Akmola region
Borrower
Jasil Jel Energy LLP, «Borey Energo» LLP, «Energo Trust» LLP, Sofiyevskaya Wind Power Plant LLP, Arkalyk Wind Power Plant LLP
Beneficiaries
«CPIH Netherlands B.V.» company, «Sao Simao Investment Limited» company, China Power International Holding Ltd. (China) – State Power Investment Corporation Limited (beneficial shareholder of СPIH)
Region
Akmola region
Industry
Energy
Application status
Approved
Reconstruction of Almaty CHP-3
Borrower
Almaty electric stations JSC
Beneficiaries
State Institution "State Property and Privatization Committee of the Ministry of Finance of the Republic of Kazakhstan"
Region
Almaty city
Industry
Energy
Application status
Approved
Construction of a Balkhash Power Station With a Capacity of 50 MW in Balkhash, Karaganda Region (Stage II)
Borrower
KAZ GREEN ENERGY LLP
Beneficiaries
Vladimir Sergeevich Kim, Eduard Viktorovich Ogai Vladimir Viktorovich Jumanbayev
Region
Karaganda region
Industry
Energy
Application status
Approved
Construction of the Radisson Turkistan hotel in Almaty
Borrower
Upstate LLP
Beneficiaries
Nurbosynov Baglan
Region
Almaty city
Industry
Tourism
Application status
At the stage of Banking expertise
Multifunctional educational and health complex "AQUALINA RESORT"
Borrower
Caspian Plaza LPP
Beneficiaries
Belovich Pavel
Region
Mangistau region
Industry
Tourism
Application status
At the stage of Indicative analysis
Closed-cycle poultry complex for the production and processing of broiler meat (3rd stage)
Borrower
Prima Kus LLP
Beneficiaries
Garber Alexander
Region
Almaty region
Industry
Agricultural sector
Application status
At the stage of Banking expertise
Construction of the Hilton hotel in Almaty
Borrower
Trade Market 1 LLP
Beneficiaries
Kasanov Usein
Region
Almaty city
Industry
Tourism
Application status
Approved
Construction of a university multidisciplinary hospital with 900 beds and a clinical diagnostic center for 700 visits per shift in Shymkent
Borrower
Kazakh Innovation University LLP
Beneficiaries
Seitzhanov S., Seitzhanova K., Seitzhanov B., Seitzhanova Zh., Seitzhanov B., Seitzhanov N.
Region
Shymkent city
Industry
Healthcare
Application status
At the stage of Banking expertise
Construction of a power plant based on a combined cycle gas plant with a maneuverable generation mode with a total capacity of up to 1000 MW
Borrower
PGU Turkestan LLP
Beneficiaries
Samruk-Kazyna JSC
Region
Turkestan region
Industry
Energy
Application status
Approved
Construction of private schools by Farabi International School