15,7 mln $ |
7%, in tenge |
Kostanay region |
Mechanical engineering |
|
|
267,3 bln ₸ |
10%, in tenge |
Interregional project |
Transport and logistics |
|
|
3,590 bln ₸ |
6,4%, in tenge |
Kostanay |
Food industry |
|
|
25,4 bln ₸ |
1,75%, in tenge |
Interregional project |
Transport and logistics |
|
|
$463,418 mln |
from the date of commencement of financing until 08.12.2022 – 6.3%, in US dollars
from 09.12.2022 until the end of the financing period - 6.72%, in US dollars |
Pavlodar region |
Energy |
|
|
141,99 bln ₸ |
Limit No. 1 - 7.9% per annum, in tenge
Limit №2 - 10% per annum, in tenge |
Karaganda region |
Mining and metallurgical complex and metallurgy |
|
|
57,461 bln ₸ |
Sublimit 1: 5%, in tenge
Sublimit 2: 7.02%, USD |
Aktau |
Chemistry and petrochemistry |
|
|
3 bln ₸ |
6,88%, in tenge |
Aktau |
Chemistry and petrochemistry |
|
|
1 018,3 mln $ |
4%, in USD |
Pavlodar region |
Mining and metallurgical complex and metallurgy |
|
|
57,7 bln ₸ |
until 29.04.2027 – 7.22%, in tenge
from 30.04.2027 – 11.72%, in tenge |
Interregional project |
Information and |
|
|
24,70 bln ₸ |
Sublimit No. 1 - 7.00%, in tenge
Sublimit №2 - 10.08%, in tenge |
Kyzylorda region |
Transport and logistics |
|
|
21,77 bln ₸ |
10,2%, in tenge |
Aktyubinsk region |
Transport and logistics |
|
|
36,36 bln ₸ |
Sublimit 1 – 8.2%, in tenge
Sublimit 2 - 8.2%, in tenge |
Turkіstan region |
Transport and logistics |
|
|
3,66 bln ₸ |
8,42%, in tenge |
Mangystau region |
Transport and logistics |
|
|
29,9 bln ₸ |
Sublimit №1 - 8.10%, in tenge
Sublimit No. 2 - 10.02%, in tenge
Sublimit No. 3 - 13.67%, in tenge |
Zhambyl region |
Transport and logistics |
|
|
1,5 bln ₸ |
6,4%, in tenge |
Turkіstan region |
Mechanical engineering |
|
|
168,63 mln $, 9 662 mln ₸ |
Sublimit No. 1 - 8.5%, in US dollars
Sublimit No. 2 - 7%, in tenge |
Western-Kazakhstan region |
Chemistry and petrochemistry |
|
|
129,24 mln $ |
9%, in US dollars;
6 months Euribor + 1.75%, increased by the tax increase multiplier (1+1/9)+3%, in euros;
6.25%, in yen;
3.2% and 7.76%, in tenge |
Kyzylorda region |
Energy |
|
|
92,5 bln ₸ |
Sublimit 1 - 7%, in tenge
Sublimit 2 - 11.1%, 10.99%, in tenge |
Nur-Sultan |
Transport and logistics |
|
|
85,7 mln $ |
Stage 1:
Sublimit 1 – 7%, in tenge
Sublimit 2 - 1.15 * 6 months.Libor + 1.28%, in US dollars
Stage 2:
Sublimit 1 – 7%, in tenge
Sublimit 2 - 6 months. Libor+5.14%, USD |
Mangystau region |
Transport and logistics |
|
|
32,03 bln ₸ |
8%, in tenge |
Interregional project |
Information and |
|
|
4 bln ₸ |
6,3%, in tenge |
Shymkent |
Food industry |
|
|
19,1 bln ₸ |
8.77%, in tenge |
Shymkent |
Mechanical engineering |
|
|
17,6 bln ₸ |
15%, in tenge |
Nur-Sultan |
Transport and logistics |
|
|
13.2 bln ₸ |
Sublimit 1: 13.00% (5% subsidized), in tenge
Sublimit 2: 13.97%, in tenge
Sublimit 3: 7.00% (NF funds), in tenge |
Turkіstan region |
Energy |
|
|
92,2 bln ₸ |
13,7%, in tenge |
Pavlodar region |
Mining and metallurgical complex and metallurgy |
|
|
27,751 bln ₸ |
15%, in tenge |
Nur-Sultan |
Manufacturing industry |
|
|
17 bln ₸ |
Sublimit 1 - 6%, in tenge
Sublimit 2 - in US dollars - 2.7%, in rubles - 5.3%. |
Almaty |
Mechanical engineering |
|
|
17 bln ₸ |
6,4%, in tenge |
Almaty |
Mechanical engineering |
|
|
31,8 bln ₸ |
1) Limit 1 - 8.27%, in tenge
2) Limit 2 - 8.48%, in tenge |
Almaty |
Mechanical engineering |
|
|
21.73 bln ₸ |
13,79%, in tenge |
Karaganda region |
Energy |
|
|
3 350 mln $ |
Limit No. 1 - 6M Libor + 4.5%, in US dollars
Limit #2 - 6M Libor + 3.9%, in USD |
Eastern-Kazakhstan region |
Mining and metallurgical complex and metallurgy |
|
|
13,37 bln ₸ |
14,76%, in tenge |
Almaty region |
Energy |
|
|
22.60 bln ₸ |
13,92%, in tenge |
Nur-Sultan |
Manufacturing industry |
|
|
17 bln ₸ |
6.4%, in USD
3.4%, in tenge |
Eastern-Kazakhstan region |
Food industry |
|
|
4,906 bln ₸ |
7,41%, in tenge |
Almaty region |
Food industry |
|
|
$424,9 mln |
on the limit in US dollars - 6 monthly Libor + 4.1%;
on the limit in tenge - 9%. |
Akmola region |
Manufacturing industry |
|
|
16,8 bln ₸ |
until April 30, 2027 – 10.00%, in tenge
from April 30, 2027 – 15.71%, in tenge |
Interregional project |
Information and |
|
|
80,49 mln $ |
7%, in tenge |
Zhambyl region |
Chemistry and petrochemistry |
|
|
47.2 bln ₸ |
15%, in tenge |
Aktau |
Tourism |
|
|
189,80 mln $ |
Limit 1 - floating, 6-month rate LIBOR + 4.93%, in US dollars
Limit 2 - 12.02%, in tenge |
Nur-Sultan |
Tourism |
|
|
87 bln ₸ |
15%, in tenge |
Turkіstan region |
Tourism |
|
|
36,591 bln ₸ |
8,9%, in tenge |
Karaganda region |
Mining and metallurgical complex and metallurgy |
|
|
406,7 mln $ |
Limit No. 1 – 9.64% per annum, in tenge
Limit No. 2 - 8.5% per annum, in US dollars
Limit No. 3, in tenge:
Sublimit No. 1 - 8% per annum
Sublimit No. 2 - 7% per annum
Sublimit No. 3 - 7% per annum |
Aktyubinsk region |
Mining and metallurgical complex and metallurgy |
|
|
15,28 bln ₸ |
7%, in tenge |
Atyrau region |
Mechanical engineering |
|
|
2 070,72 bln $ |
In US dollars - 5%
In tenge - 7.99% |
Atyrau region |
Chemistry and petrochemistry |
|
|
1,13 bln $ |
Loan 1:
Sublimit 1: 6 months LIBOR+4.5%, in USD
Sublimit 2: 10.99%, in tenge
Sublimit 3: 7.72% USD
Loan 2: 9%, in tenge |
Atyrau region |
Chemistry and petrochemistry |
|
|
27.155bln ₸ |
14,8%,in tenge |
Almaty |
Energy |
|
|
7 bln ₸ |
6,39%, in tenge |
Zhambyl region |
Chemistry and petrochemistry |
|
|
14,3 bln ₸ |
7,64%, in tenge |
Eastern-Kazakhstan region |
Mining and metallurgical complex and metallurgy |
|
|
2 bln ₸ |
6%, in tenge |
Almaty region |
Mechanical engineering |
|
|
284,87 mln $ |
7%, in tenge |
Karaganda region |
Energy |
|
|
33,576 bln ₸ |
Limit 1: 9.15/9.44%, in tenge
Limit 2: 8.47%, in tenge |
Akmola region |
Food industry |
|
|
37,003 bln ₸ |
9.47% per annum / 15% per annum, in tenge |
Nothern-Kazakhstan region |
Food industry |
|
|
5 bln ₸ |
Credit line 1 – 8%, in tenge
Credit line 2 – 8%, in tenge |
Almaty |
Food industry |
|
|
1 bln ₸ |
6%, in tenge |
Nothern-Kazakhstan region |
Food industry |
|
|
235,70 bln ₸ |
Limit No. 1 - 7.0%, in tenge
Limit number 2 - 6 months. LIBOR + 4.0%, in USD |
Pavlodar region |
Chemistry and petrochemistry |
|
|
1 905.36 mln $ |
Sublimit number 1 - 3 months. LIBOR + 3.5%, in USD
Sublimit No. 2 - 8.5%, in tenge |
Shymkent |
Chemistry and petrochemistry |
|
|
2 bln ₸ |
6%, in tenge |
Eastern-Kazakhstan region |
Food industry |
|
|
54,1 bln ₸ |
7%, in tenge |
Pavlodar region |
Mechanical engineering |
|
|
up to 29 498,9 mln ₸ |
7% и 5%, in tenge |
Kostanay |
Mechanical engineering |
|
|
13,39 bln ₸ |
7%, in tenge |
Eastern-Kazakhstan region |
Energy |
|
|
43,657 bln ₸ |
Limit 1 – 13.23%, in tenge
Limit 2 – 13%, in tenge |
Nur-Sultan |
Tourism |
|
|
13,7 bln ₸ |
9,5%, in tenge |
Shymkent |
Chemistry and petrochemistry |
|
|
68,4 bln ₸ |
13%, in tenge |
Aktau |
Tourism |
|
|
84.941 billion ₸ |
14,32%,in tenge |
Eastern-Kazakhstan region |
Energy |
|
|
138,12 billion tenge |
13,68%, in tenge |
Almaty |
Transport and logistics |
|
|
$ 410.8 mln |
by limit in US dollars - determined;
by limit in tenge - 9.1%. |
Almaty |
Manufacturing industry |
|
|
24 000 000 USD |
3%, in USD |
Eastern-Kazakhstan region |
Food industry |
|
|
1 bln ₸ |
7,4%, in tenge |
Pavlodar region |
Manufacturing industry |
|
|
17 bln ₸ |
6,83%, in tenge |
Eastern-Kazakhstan region |
Mining and metallurgical complex and metallurgy |
|
|
50,707 bln ₸ |
Limit #1, Limit #2 - 9.14%, in tenge
Limit No. 3, Limit No. 4 - 15%, in tenge |
Karaganda region |
Mining and metallurgical complex and metallurgy |
|
|
12.325 billion tenge |
14,4%, in tenge |
Almaty region |
Energy |
|
|
346,6 mln $ |
Stage 1: 1.15*6M Libor+1.15%, in USD
Stage 2: 10.72%, in tenge
Stage 3: 12% and 7.55%, in tenge |
Almaty region |
Energy |
|
|
107,5 million $ |
2.74%, in USD |
Almaty |
Construction |
|
|
1,0 bln ₸ |
8%, in tenge |
Zhambyl region |
Chemistry and petrochemistry |
|
|
107,584 bln ₸ |
Credit line 1, in tenge:
Limit 1 - 7%;
Limit 2 - 9%;
Credit line 2 – 9%, in tenge |
Interregional project |
Information and |
|