Industry:
All
Region:
All
Year of signing the Agreement on opening a credit line Business name Name of the Project/Operation Project cost DBK participation Funding status Remuneration rate Region Industry Map
2020 Turkistan Silk Way Harbor LLP Organization of the multifunctional tourist complex "Karavan-Saray" 87 bln ₸ 40 bln ₸ assimilated 15%, in tenge Turkistan region Tourism
2021 Tethys Aktau II LLP Investment project Construction of a multifunctional hotel and tourist complex in Aktau (2nd stage) 47.2 bln ₸ 16,69 bln ₸ open 15%, in tenge Aktau Tourism
2019 Atyrau Refinery LLP Construction of a deep oil refining complex at the Atyrau Oil Refinery 2 070,72 bln $ 475,75 mln $ open In US dollars - 5% In tenge - 7.99% Atyrau region Petrochemistry and oil refining
2010 Atyrau Refinery LLP Construction of a complex for the production of aromatic hydrocarbons at the Atyrau Oil Refinery 1,13 bln $ 884 mln $ open Loan 1: Sublimit 1: 6 months LIBOR+4.5%, in USD Sublimit 2: 10.99%, in tenge Sublimit 3: 7.72% USD Loan 2: 9%, in tenge Atyrau region Petrochemistry and oil refining
2016 Kazzinc LLP Pre-export financing for the purchase of raw materials for the production of products (zinc and silver bullion) and its export reconstruction of zinc production facilities 17 bln ₸ 17 bln ₸ open 15,72%, in tenge Eastern-Kazakhstan region Metallurgical industry
2014 Pavlodar Oil Chemistry Refinery LLP Modernization of Pavlodar Petrochemical Plant 235,70 bln ₸ Loan facility (not to exceed 29.4%), includes: <ul> <li>Limit No.1 – up to KZT 51.465 billion;</li> <li>Limit No.2 – up to USD 49 million</li> </ul> open Limit No. 1 - 7.0%, in tenge Limit number 2 - 6 months. LIBOR + 4.0%, in USD Pavlodar region Petrochemistry and oil refining
2021 EkibastuzFerroAlloys LLP Construction of a ferroalloy plant in Ekibastuz, Pavlodar region 92,2 bln ₸ 72 bln ₸ open 13,7%, in tenge Pavlodar region Metallurgical industry
2015, 2018 Condensat JSC Production of motor fuels of ecological class K5 Stage 1 (production of eco-class K5 gasoline) Stage 2 (production of ecoclass K5 diesel fuel) 168,63 mln $, 9 662 mln ₸ Stage 1 - Up to 120,000 $ (71.16%) <br> Sublimit №1 – 77 068 $;<br> Sublimit № 2 – 14 184 833 ₸<br> Stage 2 - 7 120 mln ₸ <br> open <div> Sublimit № 1– 8.5 % in US dollars;<br> </div> <div> Sublimit № 2– 7 % in KZ tenge </div> <div> <br> </div> Western-Kazakhstan region Petrochemistry and oil refining
2017 AtyrauNefteMash LLP Development of the oil engineering plant AtyrauNefteMash 15,28 bln ₸ 9,5 bln ₸ assimilated 7%, in tenge Atyrau region Mechanical engineering
2017 Asia Trafo LLP The factory for production of power transformers of voltage class 110 and 220 kV in Shymkent city. I Turn 19,1 bln ₸ 8.6 bln ₸ assimilated 8.77%, in tenge Ilyasov Sultan Saidullayevich Kozhabaev Saydulla Ilyasovich Shymkent Mechanical engineering
2015 JSC “Allur Group of Companies“ Improvement and stabilization of the financial and economic condition of the automotive direction of JSC "Allure Group of Companies" up to 29 498,9 mln ₸ 29 498,9 mln ₸ assimilated 7% и 5%, in tenge Kostanay Mechanical engineering
2017 PetroKazakhstan Oil Products LLP Modernization and reconstruction of the Shymkent Oil Refinery 1 905.36 mln $ 932 mln $ open Sublimit number 1 - 3 months. LIBOR + 3.5%, in USD Sublimit No. 2 - 8.5%, in tenge Shymkent Petrochemistry and oil refining
2015 KazTransGasAimak JSC "Construction of a backup line of the main gas pipeline "Uzen-Aktau" on the Uzen-Zhetybai section" 3,66 bln ₸ 3,66 bln ₸ assimilated 8,42%, in tenge Mangystau region Transport, logistics, communications
2019 Shymkent chemical company LLP Construction of a plant for the production of methyl-tert-butyl ether in Shymkent 13,7 bln ₸ 9 bln ₸ open 9,5%, in tenge Shymkent Petrochemistry and oil refining
2014 KazTransGas Aimak JSC "Modernization of the gas distribution network of the city of Taraz" 29,9 bln ₸ 19,9 bln ₸ assimilated Sublimit №1 - 8.10%, in tenge Sublimit No. 2 - 10.02%, in tenge Sublimit No. 3 - 13.67%, in tenge Zhambyl region Transport, logistics, communications
2013 KazTransGas Aimak JSC 24,70 bln ₸ 19,451 bln ₸ assimilated Sublimit No. 1 - 7.00%, in tenge Sublimit №2 - 10.08%, in tenge Kyzylorda region Transport, logistics, communications
2017 KazTransGas Aimak JSC "Modernization of the gas distribution system of the South Kazakhstan region" 36,36 bln ₸ 21,21 bln ₸ assimilated Sublimit 1 – 8.2%, in tenge Sublimit 2 - 8.2%, in tenge South Kazakhstan region Transport, logistics, communications
2020 Asia FerroAlloys LLP Construction of an enrichment plant, Saryarkа ferroalloy plant with an agglomeration factory and modernization of existing production 50,707 bln ₸ 38,810 bln ₸ assimilated Limit # 1, Limit # 2 - 9.14%, in tenge; Limit # 3, Limit # 4 - 15%, in tenge Karaganda Metallurgical industry
2021 Makinsk Poultry plant LLP Construction of the poultry plant for broiler farming with a capacity of 60 thousand tons in live weight per year with an intrasite engineering infrastructure in Bulandy district of Akmola region of the Republic of Kazakhstan 33,576 bln ₸ 16,1 bln ₸ and 14,3 bln ₸ open Limit 1: 9.15/9.44%, in tenge Limit 2: 8.47%, in tenge Akmola region Agricultural sector
2019 Kazakhtelecom JSC Implementation of LTE/GSM/UMTS networks within the territory of the Republic of Kazakhstan 107,58 bln ₸ 37 bln ₸ assimilated Limit 1 - 7%; Limit 2 - 9%; Interregional project Transport, logistics, communications
2021 Maslo-Del Petropavlovsk LLP Construction of oil extraction plant for processing oil crops in the city of Petropavlovsk 37,003 bln ₸ 12,002 bln ₸ open 9.47% per annum / 15% per annum, in tenge Nothern-Kazakhstan region Agricultural sector
2021 Tin One Mining JSC Construction of a mining and metallurgical plant with a capacity of 2.5 million tons of ore per year $ 410.8 mln 297 млн $ not open by limit in US dollars - determined; by limit in tenge - 9.1%. Nothern-Kazakhstan region Metallurgical industry
2017, 2018 Nursultan Nazarbayev International Airport JSC Reconstruction of Astana International Airport’s passenger terminal 92,5 bln ₸ 35 bln ₸ assimilated Sublimit 1 - 7%, in tenge<br> Sublimit 2 - 11.1%, 10.99%, in tenge Transport infrastructure
2017 Zhayrem Ore Mining and Processing Industrial Complex JSC The construction of a Ore Mining and Processing Industrial Complex for processing polymetallic ores in the Zhayrem settlement, Karaganda region, with a capacity of 5 million tons of ore per year 141,99 bln ₸ 93 bln ₸ assimilated Limit No. 1 - 7.9% per annum, in tenge;<br> Limit No. 2 - 10% per annum, in tenge<br> Karaganda region Metallurgical industry
2007, 2008 NC Aktau Sea Commercial Port JSC "Expansion of Aktau International Commercial Sea Port in the northern direction – Stages 1, 2" 85,7 mln $ 82 mln $ assimilated Stage 1: Sublimit 1 – 7%, in tenge Sublimit 2 - 1.15 * 6 months.Libor + 1.28%, in US dollars Stage 2: Sublimit 1 – 7%, in tenge Sublimit 2 - 6 months. Libor+5.14%, USD Mangystau region Transport infrastructure
2010 Kazakhstan Electrolytic plant JSC Construction of a plant for the production of primary aluminum in Pavlodar region with a capacity of 250,000 tons 1 018,3 mln $ 400 mln $ assimilated 4%, in USD Pavlodar region Metallurgical industry
2021 EVOLVEKZ LLP Acquisition of a 100% stake in DSK GLB LLP and expansion of the production capacity of the house-building plant 27,751 bln ₸ 22,200 bln ₸ open 15%, in tenge Manufacture of construction materials
2015 Kentau Transformer works JSC "Export operation "Increasing the export potential of JSC "Kentau Transformer Plant" 1,5 bln ₸ 1,5 bln ₸ open 6,4%, in tenge Turkistan region Mechanical engineering
2016 RG Brands Kazakhstan LLP Financing of the pre-export operation of “RG Brands Kazakhstan” LLP 4,906 bln ₸ 4,906 bln ₸ not open 7,41%, in tenge Almaty region Agricultural sector
2018 YDD Corporation LLP Construction of the plant for the production of ferrosilicon in the city of Karaganda with a production capacity of 96,000 tons per year 36,591 bln ₸ 24,120 bln ₸ assimilated 8,9%, in tenge Karaganda region Metallurgical industry
2017 Shymkentmai JSC Shymkentmai JSC export operation 4 bln ₸ 4 bln ₸ open 6,3%, in tenge Shymkent Agricultural sector
2021 Altyn Shyghys LLP Financing for the purchase of raw materials (sunflower) for further processing and export sales under the program "Pre-export financing" 24 000 000 USD 24 mln $ not open 3%, in USD Eastern-Kazakhstan region Agricultural sector
2016 Bayan Sulu JSC Export operation of Bayan Sulu JSC 3,590 bln ₸ 3,590 bln ₸ open 6.4% per annum, fixed Kostanay Agricultural sector
2020 KazAzot JSC Export operation of KazAzot JSC 3 bln ₸ 3 bln ₸ not open 6,88%, in tenge Aktau Chemical industry
2016 KAZ Minerals Aktogay LLP Construction of the Aktogay Mining and Processing plant in the East Kazakhstan region 3 350 mln $ 900 mln $ assimilated Limit No. 1 - 6M Libor + 4.5%, in US dollars Limit #2 - 6M Libor + 3.9%, in USD Eastern-Kazakhstan region Metallurgical industry
2015 KazAzot JSC Modernization of the plant for the production of mineral fertilizers with an increase in the design capacity for the production of finished products 57,461 bln ₸ 40,550 mln ₸ completed Sublimit 1: 5%, in tenge Sublimit 2: 7.02%, USD Aktau Chemical industry
2013 Aktobe rail and beam plant LLP Construction of a rail-and-beam plant with a design capacity of 430 thousand tons per year in Aktobe 406,7 mln $ 47 mln euro and 66,797 bln tenge. assimilated Limit No. 1 – 9.64% per annum, in tenge Limit No. 2 - 8.5% per annum, in US dollars Limit No. 3, in tenge: Sublimit No. 1 - 8% per annum Sublimit No. 2 - 7% per annum Sublimit No. 3 - 7% per annum Aktobe Mechanical engineering
2020 KAZPHOSPHATE LLP Financing of the purchase of raw materials and other costs associated with the pre-export operation, within the framework of the state program "Nurly Zhol", support of domestic exporters 7 bln ₸ 7 bln ₸ open 6,39%, in tenge Zhambyl region Chemical industry
2008 AgromashHolding KZ JSC "Expansion and modernization of service centers for the sale and maintenance of agricultural machinery" 15,7 mln $ 15,7 mln $ assimilated 7%, in tenge Kostanay region Mechanical engineering
2018 Kainar-AKB LLP The acquisition of raw and consumable materials for the production of starter lead-acid batteries for cars, cargo trucks, and agricultural vehicles 2 bln ₸ 2 bln ₸ open 6%, in tenge Taldykorgan Mechanical engineering
2018 Sey-Nar Industrial Complex LLP The acquisition of raw materials (sunflower) for the production of unrefined vegetable oil with further export of products 2 bln ₸ 2 bln ₸ not open 6%, in tenge Eastern-Kazakhstan region Agricultural sector
2015 Prommashkomplekt LLP Production of railway wheels 54,1 bln 36.0 billion tenge<br> 7% in tenge<br> Pavlodar region Mechanical engineering
2022 Prommashkomplekt LLP Pre-export financing of continuously cast blanks for the production of wheels of Prommashkomplekt LLP 7 bln tenge 7 bln tenge<br> open Credit line 1 - in tenge: 8% fixed and credit line 2 -in tenge: 18.83% fixed <br> Pavlodar region Mechanical engineering
2022 Kazenergocable JSC Pre -export financing of JSC Kazenergocable 5.5 billion tenge, including: Sublimit 1 - no more than 2.75 billiontenge; Sublimit 2 - no more than 2.75 billiontenge; 5.5 billion tenge, including:<br> Sublimit 1 - no more than 2.75 billiontenge; <br> Sublimit 2 - no more than 2.75 billiontenge; <br> open <div> Sublimit 1 - 5.38% per annum, fixed </div> <div> Sublimit 2 - 15.83% per annum, fixed"<br> </div> Pavlodar region Manufacturing industry
2022 JSC AsiaAgroFud Pre-export financing of JSC "AsiaAgroFud" No more than 5,000,000,000 (five billion) tenge Sublimit 1 - No more than 2,500,000,000 (two billion five hundred million) tenge Sublimit 2 - No more than 2,500,000,000 (two billion five hundred million) tenge  No more than 5,000,000,000 (five billion) tenge<br> Sublimit 1 - No more than 2,500,000,000 (two billion five hundred million) tenge<br> Sublimit 2 - No more than 2,500,000,000 (two billion five hundred million) tenge<br> open Sublimit 1 - 6.38% per annum fixed<br> Sublimit 2 - 16.83% per annum fixed<br> Almaty region Manufacturing industry
2016, 2019 Maslo-Del LLP Acquisition of oil seeds for the production of 20 000 tons of vegetable oil for Maslo-Del LLP 5 bln ₸ 5 bln ₸ open Credit line 1 – 8%, in tenge Credit line 2 – 8%, in tenge Almaty Agricultural sector
2019 Kazzinc LLP Financing of the costs of Kazzinc LLP for the purchase, raw materials and materials, their processing for the purpose of manufacturing products (copper and lead) and its export 17 bln ₸ 10 bln ₸ open 15,72 %, in tenge Eastern-Kazakhstan region Metallurgical industry
2017 Molproduct JSC Molproduct JSC pre-export financing 1 bln ₸ 1 bln ₸ open 6%, in tenge Nothern-Kazakhstan region Agricultural sector
2015 Talas Investment Company LLP Investment project for the construction of a sodium cyanide plant with a capacity of 15,000 tons in the city of Karatau 80,49 mln $ 16,192 mln ₸ completed 7%, in tenge Zhambyl region Chemical industry
2019 Talas Investment Company LLP Pre-export financing of Talas Investment Company LLP 1,0 bln ₸ 1,0 bln KZT the debt has been repaid, the issue of extending/closing the credit line is being worked out 8%, in tenge Zhambyl region Chemical industry
2020 Hyundai Trans Kazakhstan LLP Pre-export financing for Hyundai Trans Kazakhstan LLP 17 bln ₸ 17 bln ₸ open 6.40% per annum Almaty Mechanical engineering
2021 Hyundai Trans Kazakhstan LLP Pre-export financing of Hyundai Trans Kazakhstan LLP for the purchase of vehicle kits and auto components for the production and sale of Kazakhstan-assembled vehicles to the Republic of Uzbekistan 17 bln ₸ 17 млрд ₸ open 15,61% Almaty Mechanical engineering
2021 Qazaq-Astyq Group LLP Pre-export financing for Qazaq-Astyq Group LLP 17 bln ₸ 17 bln ₸ open 6.4% KZT and 3.4% $ per annum Semey, Abay region Agricultural sector
2020 Foundry Production LLP Export operation Foundry Production LLP 1 bln ₸ 1 bln ₸ not open 7,4%, in tenge Pavlodar region Mechanical engineering
2018 AAEngineering Group LLP Bank guarantees for the services of AAEngineering Group LLP for the construction of a gold recovery plant at the Dzheruy deposit in Kyrgyzstan. 113.5 million $ 10.75 mln $ guarantees issued 0.23%, in USD Almaty Design and construction
2021 Information about National Trade and Distribution Network LLP Construction, modernization, transfer and operation of an integrated network of seven wholesale distribution centers 138,12 billion tenge 110,4 billion tenge (financing provided for 19,2 billion tenge) not open 13,68%, in tenge<br> *Funding is not open Almaty Transport, logistics, communications
2019 AstanaGasKMG JSC First stage of Saryarka main gas pipeline construction 267,3 bln ₸ 51 bln ₸ assimilated 10% Interregional project Transport, logistics, communications
2014 Kazakhtelecom JSC Provision of broadband access to rural settlements of the Republic of Kazakhstan using fiber-optic communication lines technology 57,7 bln ₸ 26,6 bln ₸ assimilated until 29.04.2027 – 7.22%, in tenge<br> from 30.04.2027 – 11.72%, in tenge Interregional project Transport, logistics, communications
2015 Vagonservis JSC "Purchase of passenger cars" 25,4 bln ₸ 5 bln ₸ assimilated 1,75% Interregional project Transport, logistics, communications
2020 Private company "Aktau Tourism City LTD." Construction of the first phase of the multifunctional hotel and tourist complex Aktau Resort Hotel in Mangistau region 68,4 bln ₸ 42 bln ₸ assimilated 13%, in tenge Aktau Tourism
2017 Shanyrak Platinum LLP Construction of the Hilton hotel complex for 253 rooms, in the area of the international specialized exhibition EXPO-2017, with the involvement of the international operator Hilton Worldwide 43,657 bln ₸ 7 bln ₸ assimilated Limit 1: 13,23% annual, fixed Limit 2: 13% annual, fixed Tourism
2021 RG Processing LLP, RG Gold LLP Construction and Operation of Primary Gold-Bearing Ores Processing Facility Project $424,9 mln $ 300 mln $ open on the limit in US dollars - 6 monthly Libor + 4.1%; on the limit in tenge - 9%. Akmola region Metallurgical industry
2022 BioOperations LLP "Export operation "Pre -export financing of BioOperations LLP" 6.5billion tenge, including: Sublimit 1 - no more than 3.25billion tenge; Sublimit 2 - no more than 3.25billion tenge; 6.5billion tenge, including:<br> Sublimit 1 - no more than 3.25billion tenge;<br> Sublimit 2 - no more than 3.25billion tenge;<br> open 6.5 billion tenge, including:<br> Sublimit 1 - no more than 3.25billion tenge;<br> Sublimit 2 - no more than 3.25 billion tenge; Nothern-Kazakhstan region Manufacturing industry
2021 Makinskaya Poultry Farm LLP (3rd stage) Construction of the third stage of a broiler poultry farm in the Bulandyn district of the Akmola region of the Republic of Kazakhstan 24,820 million tenge 24,820 млрд ₸ open 9,31% / 13,59%<br> Akmola region Agricultural sector
2020 Makinskaya Poultry Farm LLP (2nd stage) Construction of the second stage of a broiler poultry farm in the Bulandyn district of the Akmola region of the Republic of Kazakhstan. 14 633 mln tenge 11 210 million tenge<br> administrated 8,47% Akmola region Food industry
2008 JSC Caustic Construction and organization of production of chlorine and caustic soda by the membrane method with a capacity of 30,000 tons per year (NaOH). 101,457 thousand US dollars 65 719 thousand US dollars completed 7% Pavlodar region Chemical industry
2021 ModeX Astana LLP Construction of a plant for the production of volumetric blocks with a capacity of 15,000 blocks per year 22.60 bln ₸ 14,94 bln ₸ open 13,92%, in tenge Manufacture of construction materials
2019 SilkNetCom JSC Providing broadband access in rural areas of the Republic of Kazakhstan on the technology of fiber-optic communication lines 16,8 bln ₸ 13,3 bln ₸ assimilated Until 30.04.2027 – 10,00% per annum<br> from 30.04.2027 – 15,71% per annum Interregional project Transport, logistics, communications
2021 Information about 100 MW WPP “Abay 1” LLP, 50 MW WPP “Abay 2” LLP Construction of a wind power plant with a total capacity of 150 MW: a 100 MW wind farm in the Ayagoz district of the East Kazakhstan region and a 50 MW wind farm in the Sarkand district of the Almaty region 84.941 billion ₸ 57,7 bln ₸ assimilated 14,32%,in tenge Abay region, Almaty region Energy
2011 JSC «Moynak HPP n. a. U.D. Kantayev» "Construction of the Moynak hydroelectric power station on the Charyn River" 346,6 mln $ 118,6 mln $ assimilated Stage 1: 1.15*6M Libor+1.15%, in USD Stage 2: 10.72%, in tenge Stage 3: 12% and 7.55%, in tenge Almaty region Energy
2021 JSC «Baskan Power» Construction of small hydroelectric power plants-2 and hydroelectric power plants-3 in Sarkand district of Almaty region 12.325 billion tenge 7,0 bln ₸ open 14,4%, in tenge Almaty region Energy
2009 Crystal Management JSC "Construction of a gas turbine power plant at the Akshabulak field" 129,24 mln $ 90 mln $ assimilated 9%, in US dollars; 6 months Euribor + 1.75%, increased by the tax increase multiplier (1+1/9)+3%, in euros; 6.25%, in yen; 3.2% and 7.76%, in tenge Kyzylorda region Energy
2018 EcoProTech-Astana LLP (EcoProTech-Astana) Construction of Zhylga photovoltaic electric power plant with a capacity of 20 MW in Turkestan region 13.2 bln ₸ 9,047 bln ₸ assimilated Sub-limit 1: 13.00% (5% subsidized); Sub-limit 2: 13.97%; Sub-limit 3: 7.00% (NF funds) South Kazakhstan region Energy
2018 Eurasian Energy Corporation JSC Reconstruction of power station No. 5 and coal mine “Vostochny” $463,418 mln 360 mln $ assimilated from the date of commencement of financing until 08.12.2022 – 6.3%, in US dollars from 09.12.2022 until the end of the financing period - 6.72%, in US dollars Pavlodar region Energy
2021 KAZ GREEN ENERGY LLP Construction of a solar power station "Balkhash" with a capacity of 50 MW (stage I) in the Karaganda region 21.73 bln ₸ 16,95 bln ₸ open 13,79%, in tenge Karaganda region Energy
2020 MISTRAL ENERGY LLP Construction of a solar power plant Kaskelen 50 MW 13,37 bln ₸ 10,69 bln ₸ assimilated 14,76%, in tenge Almaty region Energy
2016 Turgusun-1 LLP Construction of the Turgusun HPP in the East Kazakhstan region 13,39 bln ₸ 10,322 bln ₸ open 7%, in tenge Eastern-Kazakhstan region Energy
2020 Continental Logistics LLP Modernization of TLC in the city of Astana, construction of class C warehouses, a garage of the hangar type on the territory of the TLC, the creation of the necessary warehouse logistics to service food retail. 17,6 bln ₸ 7 bln ₸ assimilated 15%, in tenge Transport, logistics, communications
2021 ZHEL ELECTRIC LLP Construction of the Ybyray wind farm with a capacity of 50 MW in the Kostanay district of the Kostanay region 27.155bln ₸ 16,95 bln ₸ open 14,8%,in tenge Kostanay region Energy
2017 KazTransGasAimak JSC Gasification of settlements and modernization of gas distribution networks of Aktobe region 21,77 bln ₸ 13,023 bln ₸ assimilated 10,2%, in tenge Aktyubinsk region Transport, logistics, communications
2014 Transtelecom JSC Construction of a communication platform hardware and software complex along railway lines 32,03 bln ₸ 25,420 bln ₸ assimilated 8%, in tenge Interregional project Transport, logistics, communications
2022 Hyundai Trans Kazakhstan LLP Рlant for the production of Hyundai passenger cars 31,8 bln ₸ 17 bln ₸ open 1) Limit 1 - 8.27% in tenge; 2) Limit 2 - 8.48% in tenge. Almaty Mechanical engineering