1 |
Oblako Country Club |
|
|
|
Kim Viktor Borisovich (51%), Tskhai Irina Vladimirovna (49%) |
|
|
|
Almaty region |
Tourism |
|
At the stage of Indicative analysis
|
2 |
Tourist base «Ski & Spa Resort» |
|
|
|
Saduakas Elmira |
|
|
|
Almaty |
Tourism |
|
At the stage of Banking expertise
|
3 |
Creation of the tourist and recreational center «Kaskasu» by 2023 in Tolebi district of Turkestan region |
|
|
|
51% – Eristail-KZ LLP, 49% – JSC SEC Turkestan, Beneficiary: Mamirov Oirat Maratovich |
|
|
|
Turkistan region |
Tourism |
|
At the stage of Indicative analysis
|
4 |
Construction of a plant for the production of fittings in Shymkent |
|
|
|
Omarov Ruslan Abdurashitovich – 70%, Omarova Aida Abdurashitovna – 15%, Omarova Akmaral Abdurashitovna – 15% |
|
|
|
Shymkent |
Manufacture of construction materials |
|
Collection of documents for stage of Banking expertise
|
5 |
Construction of a production complex for the production of pumping equipment, pipeline fittings and asynchronous electric motors in the free economic zone «G4City», Konaev, Almaty region |
|
|
|
Adayev Rakhmatulla, Akhmetova Galina |
|
|
|
Almaty region |
Mechanical engineering |
|
Collection of documents for the stage of Indicative analysis
|
6 |
Expansion of sodium cyanide production with a capacity of 15 thousand tons per year in Karatau (2nd stage) |
|
|
|
51% FCIC Ontustik LLP (100% the Seitzhanov family) 18% Tyndybekov A.T. 15% Aldashov B.A.* 16% Abykaev M.N. * The Bank decided to alienate 15 % of the share of Aldashov Baktiyar Abilkairovich in favor of FCIC Ontustik LLP |
|
|
|
Zhambyl region |
Chemical industry |
|
Approved
|
7 |
Construction of a Soda Ash Plant in Zhambyl Region With a Capacity of up to 500,000 Tons/Year. |
|
|
|
mr. Ali Riza Yildirim, mr. Mehmet Yildirim, mr. Yuksel Yildirim |
|
|
|
Zhambyl region |
Chemical industry |
|
Approved
|
8 |
Construction of a Mineral Fertilizer Plant in Zhambyl Region with a Capacity of 150,000 Tons Per Year |
|
|
|
Kanat Kairzhanovich Kanafin |
|
|
|
Zhambyl region |
Chemical industry |
|
At the stage of Indicative analysis
|
9 |
Construction of a Sodium Cyanide Production Plant in SEZ Khimpark Taraz With a Capacity of 25,000 Tons Per Year |
|
|
|
Igor Vetiul, Bakhrom Burkhonovich Jalolov, Vladimir Viktorovich Jumanbayev, Diyar Bakhytbekovich Kanashev, Kairat Karibayevich Rakhishov, Gouden Reserves B.V. |
|
|
|
Zhambyl region |
Chemical industry |
|
Collection of documents for the stage of Banking expertise
|
10 |
Forming of Dairy Farms for 1,200 heads in Kostanay Region |
|
|
|
Adilzhan Idrisovich Smailov |
|
|
|
Kostanay region |
Agricultural sector |
|
At the stage of Indicative analysis
|
11 |
Agro-Industrial Complex for Beef Production in Akmola Region |
|
|
|
Abu Amirkhan Oralbayuly, Oralbay Askergaliyevich Abuov, Dina Beibitovna Nurpeissova, Mariya Pavlovna Vakhrusheva, Kairat Amangeldiyevich Tassimov |
|
|
|
Akmola region |
Agricultural sector |
|
At the stage of Indicative analysis
|
12 |
Construction of an Aluminum and Bimetallic Radiators Plant |
|
|
|
Nursultan Amangeldiuly Zhumabek |
|
|
|
Karaganda region |
Manufacture of construction materials |
|
At the stage of Banking expertise
|
13 |
Vertically Integrated Poultry Farm for Broiler Meat Production, With a Capacity of 24,000 Tons Per Year, in the West Kazakhstan Region |
|
|
|
mr. Menahem Shalom (Israel) mr. Mosenson Ysroel (Israel) |
|
|
|
West Kazakhstan region |
Food industry |
|
At the stage of Indicative analysis
|
14 |
Construction of a factory of household appliances in Zhambyl region |
|
|
|
Komekbaeva Aliya Artykbaevna |
|
|
|
Zhambyl region |
Mechanical engineering |
|
At the stage of Indicative analysis
|
15 |
Construction of a Power Plant Based on A Combined Cycle Gas Plant With a Flexible Generation Mode with a Total Capacity of Up To 1,000 MW |
|
|
|
Samruk-Kazyna NWF JSC |
|
|
|
Turkistan region |
Energy |
|
At the stage of Indicative analysis
|
16 |
Construction of a Complex of Technical Facilities and Facilities to Carry Out Operations to Diversify Oil Exports, Container Transportation and Transshipment of Other Cargo |
|
|
|
Samruk-Kazyna NWF JSC |
|
|
|
Mangystau region |
Transport infrastructure |
|
Collection of documents for the stage of Indicative analysis
|
17 |
Expansion of Aktau International Airport |
|
|
|
Department of Finance of Mangistau Region |
|
|
|
Mangystau region |
Transport infrastructure |
|
Collection of documents for the stage of Indicative analysis
|
18 |
Organization of Tire Production in Saran, Karaganda Region |
|
|
|
Andrey Lavrentiyev |
|
|
|
Karaganda region |
Mechanical engineering |
|
At the stage of Indicative analysis
|
19 |
Expansion (Increase in Capacity) of a Gas Piston Power Plant to 40 MW |
|
|
|
Sagat Tugelbayev |
|
|
|
Atyrau region |
Energy |
|
Collection of documents for the third stage of Banking expertise
|
20 |
Reconstruction of CHPP-3 |
|
|
|
Samruk-Energo JSC |
|
|
|
Almaty |
Energy |
|
At the stage of consideration «Indicative analysis»
|
21 |
Construction of Oil Extraction Plant in the Free Economic Zone Qyzyljar, North-Kazakhstan Region, Petropavlovsk City |
|
|
|
Amir Islamov |
|
|
|
North Kazakhstan region |
Food industry |
|
At the stage of Indicative analysis
|
22 |
Multifunctional marine terminal «Sarzha». Grain Terminal |
|
|
|
Semurg Holding PTE.LTD |
|
|
|
Mangystau region |
Transport infrastructure |
|
Collection of documents for the stage of Banking expertise
|
23 |
Construction of Meat Processing Complex in Abai Region of the Republic of Kazakhstan, Semipalatinsk Meat Canning Plant |
|
|
|
Kydyrbek Talassov |
|
|
|
Abay region |
Agricultural sector |
|
At the stage of Indicative analysis
|
24 |
Construction of a poultry farm with a capacity of 12,500 tons of poultry meat per year in Zerendinsky district of Akmola region of the Republic of Kazakhstan |
|
|
|
Khalisha Savchuk, Tatyana Moiseyenko |
|
|
|
Akmola region |
Agricultural sector |
|
The «Banking expertise» stage has been completed
|
25 |
Expansion of the mining and processing plant for the production of copper and nickel concentrates at the Maksut deposit of the company BAST JSC |
|
|
|
Turlov Timur |
|
|
|
Abay region |
Metallurgical industry |
|
At the stage of Indicative analysis
|
26 |
Expansion of production capacity to increase new production lines and replenish working capital for pre-export financing |
|
|
|
Kairat Mazhibayev |
|
|
|
Almaty region |
Food industry |
|
Approved
|
27 |
Construction of a Gas Chemical Complex for Methanol Production With a Capacity of 130 Thous Tons |
|
|
|
Altyn Duisimbay, Dina Demidova, Galiya Barlybayeva, Alybek Sytdykov, Alibi Badashev, Erken Kasenbekov, Chokan Nurtaye,v Gulnara Baibolova |
|
|
|
West Kazakhstan region |
Petrochemistry and oil refining |
|
Collection of documents for stage of Banking expertise
|
28 |
Construction of Multifunctional Hotel & Tourist Complex. Phase II in the Warm Beach area, Aktau, Mangystau region. Hotel and Tourist Complex |
|
|
|
mr. Fettah Tamince |
|
|
|
Mangystau region |
Tourism |
|
At the stage of Banking expertise
|
29 |
Creation of a World-Class Innovative Entrepreneurial University in PIT Alatau |
|
|
|
Maral Kozhakhmetova, Tulegen Kozhakhmetov, Samatdin Ablakhan, Mirgali Kunayev |
|
|
|
Almaty |
Education |
|
Collection of documents for the stage of Indicative analysis
|
30 |
Construction of a group water pipeline to provide drinking water to populated areas of the Turkestan region with a cascade of hydroelectric power stations on the Ugam River |
|
|
|
Seitzhanov S. – 50% share, the remaining 50% belongs to the Seitzhanov family of 5 people (10% per person) |
|
|
|
Turkistan region |
Transport infrastructure |
|
Collection of documents for the stage of Indicative analysis
|
31 |
Modernization of infrastructure and updating of special equipment and equipment of the Uralsk airport |
|
|
|
Oral Airport Holding LLP – 100% participation share (Daulet Azimkhanovich Kilybaev – 49%, Uralsk Management LLP, RETRANS JSC – 44,1%) |
|
|
|
West Kazakhstan region |
Transport infrastructure |
|
Collection of documents for the stage of Indicative analysis
|
32 |
Expansion and renovation of existing production facilities at the Karaganda airport |
|
|
|
«Sky Service» LLP (Sky Service) – 100% participation share (Ospanov E.M. 95%, Akanov A.Kh. – 5%) |
|
|
|
Karaganda region |
Transport infrastructure |
|
Collection of documents for the stage of Indicative analysis
|
33 |
Construction of a Soda Ash Plant in Kyzylorda Region With a Capacity of 300 Thous Tons Per Year |
|
|
|
Dauren Mukashev |
|
|
|
Kyzylorda region |
Chemical industry |
|
Collection of documents for stage of Banking expertise
|
34 |
Construction and operation of a ferrosilicon production plant in Ekibastuz, Pavlodar region |
|
|
|
Kan Konstantin Alexandrovich, Kan Sergey Vladimirovich, Ibraeva Marina Leonidovna |
|
|
|
Pavlodar region |
Metallurgical industry |
|
At the stage of Indicative analysis
|
35 |
Installation of a Complex Gas Processing Unit With a Capacity of 1000,000,000 nm3/Year at the Kashagan Field of Atyrau Region |
|
|
|
SI Committee of State Property and Privatization under the Ministry of Finance of the Republic |
|
|
|
Atyrau region |
Petrochemistry and oil refining |
|
Approved
|
36 |
Construction of an aviation cargo hub on the territory of Khorgos |
|
|
|
Shortanbayev Y.K. |
|
|
|
Zhetysu region |
Transport infrastructure |
|
Collection of documents for the stage of Indicative analysis
|
37 |
Construction of a new gas processing plant |
|
|
|
Government of the Republic of Kazakhstan |
|
|
|
Mangystau region |
Petrochemistry and oil refining |
|
Collection of documents for the stage of Indicative analysis
|
38 |
Construction of an Alkylate production plant |
|
|
|
Khamitova Arailym Rakhmetollayevna |
|
|
|
Pavlodar region |
Petrochemistry and oil refining |
|
Collection of documents for the stage of Indicative analysis
|
39 |
Construction of a new hydrogen production plant for the Pavlodar petrochemical plant |
|
|
|
Air Liquide (75%), JSC NC KazMunayGas (25%) |
|
|
|
Pavlodar region |
Petrochemistry and oil refining |
|
Collection of documents for the stage of Indicative analysis
|
40 |
Construction of a Balkhash Power Station With a Capacity of 50 MW in Balkhash, Karaganda Region (Stage II) |
|
|
|
Vladimir Sergeevich Kim, Eduard Viktorovich Ogai Vladimir Viktorovich Jumanbayev |
|
|
|
Karaganda region |
Energy |
|
Collection of documents for the stage of Banking expertise
|
41 |
Construction of a plant for the production of direct reduction iron with a capacity of 200 tons/year |
|
|
|
Abuov Mirbulat Gaysinovich – 50%, Edilbayev Abdraman Ibrahimovich – 50% |
|
|
|
Karaganda region |
Metallurgical industry |
|
At the stage of Indicative analysis
|
42 |
Organization of production of metallic silicon |
|
|
|
Mauleisharafiddinuly Nasyrulla |
|
|
|
Ulytau region |
Metallurgical industry |
|
At the stage of Indicative analysis
|
43 |
Construction of a modern metallurgical plant for the production of low-alloy special purpose steels |
|
|
|
Denis Leonidovich Hegai – 74%, Partner Plus Firm LLP (Founder S.V. Pavlinger) – 26% |
|
|
|
Karaganda region |
Metallurgical industry |
|
At the stage of Indicative analysis
|
44 |
Construction of a processing plant for processing man-made mineral formations in the village Verkhneberezovka, East Kazakhstan region (without external engineering networks) |
|
|
|
Biguzin Abdykarim Kairbekovich |
|
|
|
East Kazakhstan region |
Metallurgical industry |
|
At the stage of Indicative analysis
|
45 |
Financing of capital investments in order to increase production capacity and replenishment of working capital |
|
|
|
Alexander Mashkevich – 20,72 %, Patokh Shodiev – 18,57 %, Makardaskhan Ibragimova – 20,71 %, Government of the Republic of Kazakhstan – 40% |
|
|
|
Pavlodar region |
Metallurgical industry |
|
Collection of documents for the stage of Indicative analysis
|
46 |
Construction of a longitudinally welded pipes plant |
|
|
|
Alliance Invest kz LLP, Almurat Kalybaev – 1% Zarina Urakova – 99% |
|
|
|
Astana |
Manufacture of construction materials |
|
At the stage of Indicative analysis
|
47 |
|
|
|
|
|
|
|
|
Karaganda region |
Metallurgical industry |
|
|
48 |
|
|
|
|
|
|
|
|
Aktobe region |
Metallurgical industry |
|
|
49 |
Strengthening the electrical network of the Southern zone of the UES of Kazakhstan. Construction of electrical grid facilities |
|
|
|
Government of the Republic of Kazakhstan |
|
|
|
Interregional project |
Energy |
|
Collection of documents for the stage of Indicative analysis
|
50 |
Construction of a data processing center for 4,000 Tier IV racks |
|
|
|
Turlov Timur Ruslanovich, Baskakova Olga Sergeevna, Mashagin Stanislav Olegovich, Burnashev Alexey Igorevich |
|
|
|
Astana |
Information and communication |
|
Collection of documents for the stage of Indicative analysis
|
51 |
Construction of a plant of fiber cement panels with a capacity of 1 million m2, in the Almaty region, IZ «Kairat» |
|
|
|
Saduakasov Maksat Orazkhanuly |
|
|
|
Almaty region |
Manufacture of construction materials |
|
Collection of documents for the stage of Indicative analysis
|
52 |
Construction of an aluminum profiles plant with a remelting shop with a capacity of 12,000 tons/year, in the Almaty region, IZ «Kairat» |
|
|
|
Saduakasov Maksat Orazkhanuly |
|
|
|
Almaty region |
Manufacture of construction materials |
|
Collection of documents for the stage of Indicative analysis
|
53 |
Construction of a 150 MW Wind Farm (Khromtau-1) in Aktobe Region |
|
|
|
Patokh Shodiyev, Mukadaskhan Ibragimova, Alexander Mashkevich, Government of the Republic of Kazakhstan |
|
|
|
Aktobe region |
Energy |
|
Approved
|
54 |
Construction of a university multidisciplinary hospital with 800 beds and a clinical diagnostic center (polyclinic) for 700 visits per shift in Shymkent |
|
|
|
Seitzhanov Serikzhan, Seitzhanova Kanshaim Kudaibergenovna, Seitzhanov Bauyrzhan Serikzhanovich, Seitzhanova Zhanna Serikzhanovna, Seitzhan Bakytzhan Serikzhanovich, Seitzhanov Nurzhan Serikzhanovich |
|
|
|
Shymkent |
Medicine |
|
At the stage of Indicative analysis
|
|
TOTAL: |
131 600 |