Year of signing the Agreement on opening a credit line
DBK participation
Region
Industry
amount of funding, million tenge
Action
1
Expansion of production capacity to increase new production lines and replenish working capital for pre-export financing
Almaty region
Food industry
2
Construction of Oil Extraction Plant in the Free Economic Zone Qyzyljar, North-Kazakhstan Region, Petropavlovsk City
North Kazakhstan region
Food industry
3
Installation of a Complex Gas Processing Unit With a Capacity of 1000,000,000 nm3/Year at the Kashagan Field of Atyrau Region
Atyrau region
Petrochemistry and oil refining
4
Construction of Multifunctional Hotel & Tourist Complex. Phase II in the Warm Beach area, Aktau, Mangystau region. Hotel and Tourist Complex
Mangystau region
Tourism
5
Construction of a 150 MW Wind Farm (Khromtau-1) in Aktobe Region
Aktobe region
Energy
6
Tourist base «Ski & Spa Resort»
Almaty
Tourism
7
Reconstruction of Almaty CHP-3
Almaty
Energy
8
Strengthening the electrical network of the Southern zone of the UES of Kazakhstan. Construction of electrical grid facilities
Interregional project
Energy
9
Construction of a university multidisciplinary hospital with 800 beds and a clinical diagnostic center (polyclinic) for 700 visits per shift in Shymkent
Shymkent
Medicine
10
Construction of a Balkhash Power Station With a Capacity of 50 MW in Balkhash, Karaganda Region (Stage II)
Karaganda region
Energy
11
Creation of the tourist and recreational center «Kaskasu» by 2023 in Tolebi district of Turkestan region
Turkistan region
Tourism
12
Construction of a new hydrogen production plant for the Pavlodar petrochemical plant
Pavlodar region
Petrochemistry and oil refining
13
Construction and operation of a full-cycle automobile plant for the production of vehicles
Almaty
Mechanical engineering
14
Organization of the Atyrau Carriage Building Company's activities for the production of freight railcars
Atyrau region
Mechanical engineering
15
Acquisition of equipment for the Data Center for 200 racks in Astana
Astana
Information and communication
16
Construction of the highway «Rudny city bypass» in Kostanay region, length of 17 km
Kostanay region
Construction, reconstruction, repair, toll traffic and maintenance of highways
17
Construction of an international hospital with 200 beds in Almaty
Almaty
Healthcare
18
Construction and commissioning of the Mining HPP-1 (19 MW) and HPP-2 (23 MW)
Zhetysu region
Energy
19
Construction of a 340 MW renewable power plant in the Southern Zone
Turkistan region
Energy
20
Construction of a Gas Chemical Complex for Methanol Production With a Capacity of 130 Thous Tons
West Kazakhstan region
Petrochemistry and oil refining
21
Production of PET molds for the food sector
Almaty
Petrochemistry and oil refining
22
Construction of a Mineral Fertilizer Plant in Zhambyl Region with a Capacity of 150,000 Tons Per Year
Zhambyl region
Chemical industry
23
Construction of a Power Plant Based on A Combined Cycle Gas Plant With a Flexible Generation Mode with a Total Capacity of Up To 1,000 MW
Turkistan region
Energy
24
Construction of a modern metallurgical plant for the production of low-alloy special purpose steels
Karaganda region
Metallurgical industry
25
Construction of a processing plant for processing man-made mineral formations in the village Verkhneberezovka, East Kazakhstan region (without external engineering networks)
East Kazakhstan region
Metallurgical industry
26
Construction of a hydrometallurgical plant for the production of nickel sulfate at the Bogetkol deposit in the village of Aitekebi in the Aktobe region of the Republic of Kazakhstan
Aktobe region
Metallurgical industry
27
Development of an oil and gas field and construction of a gas processing plant
Atyrau region
Petrochemistry and oil refining
28
Modernisation of the 220.95 MW wind farm in Akmola region
Akmola region
Energy
29
Plant for the production of ceramic products in Karaganda, Karaganda region
Karaganda region
Manufacture of construction materials
30
Construction of the Balkhash solar power plant with a capacity of 30 MW
Karaganda region
Energy
31
Construction of an Alkylate production plant
Pavlodar region
Petrochemistry and oil refining
32
Construction of a new gas processing plant
Mangystau region
Petrochemistry and oil refining
33
Industrial development of polymetallic ores of the Shalkiya deposit in the Kyzylorda region with the construction of an enrichment plant
Kyzylorda region
Metallurgical industry
34
Construction of a high-tech hydrometallurgical plant
Pavlodar region
Metallurgical industry
35
Construction of a longitudinally welded pipes plant
Astana
Manufacture of construction materials
36
Construction of a longitudinally welded pipes plant
Mangystau region
Manufacture of construction materials
37
Construction of a plant for the production of glass containers in Kyzylorda
Kyzylorda region
Manufacture of construction materials
38
Expansion and creation of a new ceramic tile production stage II with a production capacity of 4 million sq.m./year
Aktobe region
Manufacture of construction materials
39
Construction of the industrial and production complex PK«Altyn Taga» LLP for the production of reinforced concrete products in the Almaty region
Almaty region
Manufacture of construction materials
40
Construction of a heavy machinery plant in Atyrau region
Atyrau region
Mechanical engineering
41
Construction of Data Processing Center building in Ekibastuz
Astana
Information and communication
42
Expansion of Shakhtinskaya CHP in Shakhtinsk by the construction of a gas turbine power plant
Karaganda region
Energy
43
Construction of the Merke HPS cascade-5,6,7
Zhambyl region
Energy
44
Construction of a multidisciplinary hospital with a polyclinic in Almaty
Almaty
Healthcare
45
Construction and operation of a multidisciplinary hospital with 630 beds in Kokshetau
Akmola region
Healthcare
46
Implementation of the 1st stage of the 1 GW Renewable Energy Project
Turkistan region
Energy
47
Construction of a Soda Ash Plant in Kyzylorda Region With a Capacity of 300 Thous Tons Per Year
Kyzylorda region
Chemical industry
48
Construction of a Sodium Cyanide Production Plant in SEZ Khimpark Taraz With a Capacity of 25,000 Tons Per Year
Zhambyl region
Chemical industry
49
Organization of the Atyrau Carriage Building Company's activities for the production of freight railcars
Atyrau region
Mechanical engineering
50
Construction of a group water pipeline to provide drinking water to populated areas of the Turkestan region with a cascade of hydroelectric power stations on the Ugam River
Turkistan region
Transport infrastructure
51
Comprehensive reconstruction of Karaganda International Airport
Karaganda region
Transport infrastructure
52
Launch of a new cloud service provider in Kazakhstan
Almaty
Information and communication
53
Construction, reconstruction, major and medium repairs of highways with road maintenance equipment
Interregional project
Construction, reconstruction, repair, toll traffic and maintenance of highways
54
Construction and operation of a ferrosilicon production plant in Ekibastuz, Pavlodar region
Pavlodar region
Metallurgical industry
55
Construction of a truck assembly plant in Semey
Abay region
Mechanical engineering
56
Construction of a 150 MW wind farm in Baidibek district of Turkestan region
Turkistan region
Energy
57
Issue of a bank guarantee of the Development Bank of Kazakhstan JSC for the project "Construction of a combined cycle gas plant with a capacity of 160 MW in Aktau, Mangystau region"
Mangystau region
Energy
58
Modernization of boiler unit No. 7 CHPP-1 (using natural gas as fuel)
Mangystau region
Energy
59
Construction of the 50 MW Sarkylmas Kuat wind farm
Mangystau region
Energy
TOTAL:
198 460
Expansion of production capacity to increase new production lines and replenish working capital for pre-export financing
Borrower
RG Brands Kazakhstan LLP
Beneficiaries
Kairat Mazhibayev
Region
Almaty region
Industry
Food industry
Application status
Approved
Construction of Oil Extraction Plant in the Free Economic Zone Qyzyljar, North-Kazakhstan Region, Petropavlovsk City
Borrower
Atameken-Agro Oils LLP
Beneficiaries
Amir Islamov
Region
North Kazakhstan region
Industry
Food industry
Application status
At the stage of Indicative analysis
Installation of a Complex Gas Processing Unit With a Capacity of 1000,000,000 nm3/Year at the Kashagan Field of Atyrau Region
Borrower
GPC Investment LLP
Beneficiaries
SI Committee of State Property and Privatization under the Ministry of Finance of the Republic
Region
Atyrau region
Industry
Petrochemistry and oil refining
Application status
Approved
Construction of Multifunctional Hotel & Tourist Complex. Phase II in the Warm Beach area, Aktau, Mangystau region. Hotel and Tourist Complex
Borrower
TETHYS AKTAU I LLP
Beneficiaries
mr. Fettah Tamince
Region
Mangystau region
Industry
Tourism
Application status
At the stage of Banking expertise
Construction of a 150 MW Wind Farm (Khromtau-1) in Aktobe Region
Borrower
Kazakhstan Electrolysis Plant JSC
Beneficiaries
Patokh Shodiyev, Mukadaskhan Ibragimova, Alexander Mashkevich, Government of the Republic of Kazakhstan
Region
Aktobe region
Industry
Energy
Application status
Approved
Tourist base «Ski & Spa Resort»
Borrower
Sadu Development LLP
Beneficiaries
Saduakas Elmira
Region
Almaty
Industry
Tourism
Application status
At the stage of Banking expertise
Reconstruction of Almaty CHP-3
Borrower
Almaty electric stations JSC
Beneficiaries
Samruk-Energo JSC
Region
Almaty
Industry
Energy
Application status
At the stage of Banking expertise
Strengthening the electrical network of the Southern zone of the UES of Kazakhstan. Construction of electrical grid facilities
Borrower
KEGOC JSC
Beneficiaries
Government of the Republic of Kazakhstan
Region
Interregional project
Industry
Energy
Application status
At the stage of Indicative analysis
Construction of a university multidisciplinary hospital with 800 beds and a clinical diagnostic center (polyclinic) for 700 visits per shift in Shymkent
Collection of documents for the stage of Indicative analysis
Construction of a Gas Chemical Complex for Methanol Production With a Capacity of 130 Thous Tons
Borrower
Zhaik Petroleum Ltd LLP
Beneficiaries
Altyn Duisimbay, Dina Demidova, Galiya Barlybayeva, Alybek Sytdykov, Alibi Badashev, Erken Kasenbekov, Chokan Nurtaye,v Gulnara Baibolova
Region
West Kazakhstan region
Industry
Petrochemistry and oil refining
Application status
At the stage of Banking expertise
Production of PET molds for the food sector
Borrower
Koksan Kazakhstan LLP
Beneficiaries
KOKSAN PET VE PLASTIK AMBALAJ SANAYI VE TICARET ANONIM SIRKETI
Region
Almaty
Industry
Petrochemistry and oil refining
Application status
Collection of documents for the stage Indicative analysis
Construction of a Mineral Fertilizer Plant in Zhambyl Region with a Capacity of 150,000 Tons Per Year
Borrower
ASIACHEM LLP
Beneficiaries
Kanat Kairzhanovich Kanafin
Region
Zhambyl region
Industry
Chemical industry
Application status
Collection of documents for the stage «Banking expertise»
Construction of a Power Plant Based on A Combined Cycle Gas Plant With a Flexible Generation Mode with a Total Capacity of Up To 1,000 MW
Borrower
CCP Turkestan LLP
Beneficiaries
Samruk-Kazyna NWF JSC
Region
Turkistan region
Industry
Energy
Application status
At the stage of Banking expertise
Construction of a modern metallurgical plant for the production of low-alloy special purpose steels
Borrower
KAZAKHSTAL LLP
Beneficiaries
Denis Leonidovich Hegai, Partner Plus Firm LLP (Founder S.V. Pavlinger)
Region
Karaganda region
Industry
Metallurgical industry
Application status
Collection of documents for the stage Banking expertise
Construction of a processing plant for processing man-made mineral formations in the village Verkhneberezovka, East Kazakhstan region (without external engineering networks)
Borrower
Rich Land Int LLP
Beneficiaries
Biguzin Abdykarim Kairbekovich
Region
East Kazakhstan region
Industry
Metallurgical industry
Application status
Collection of documents for the stage Banking expertise
Construction of a hydrometallurgical plant for the production of nickel sulfate at the Bogetkol deposit in the village of Aitekebi in the Aktobe region of the Republic of Kazakhstan
Collecting documents for the stage Indicative analysis
Modernisation of the 220.95 MW wind farm in Akmola region
Borrower
Jasil Jel Energy LLP, «Borey Energo» LLP, «Energo Trust» LLP, Sofiyevskaya Wind Power Plant LLP, Arkalyk Wind Power Plant LLP
Beneficiaries
«CPIH Netherlands B.V.» company, «Sao Simao Investment Limited» company, China Power International Holding Ltd. (China) – State Power Investment Corporation Limited (beneficial shareholder of СPIH)
Region
Akmola region
Industry
Energy
Application status
Approved
Plant for the production of ceramic products in Karaganda, Karaganda region
Borrower
QAZCLINKER LLP
Beneficiaries
Smagulov Daulet Smagulovich
Region
Karaganda region
Industry
Manufacture of construction materials
Application status
Collection of documents for the stage Banking expertise
Construction of the Balkhash solar power plant with a capacity of 30 MW
Borrower
AA SOLAR LLP
Beneficiaries
Ogai Eduard Viktorovich, Dzhumanbayev Vladimir Viktorovich
Region
Karaganda region
Industry
Energy
Application status
At the stage of Indicative analysis
Construction of an Alkylate production plant
Borrower
INTERTRANS C A LLP
Beneficiaries
Khamitova Arailym Rakhmetollayevna
Region
Pavlodar region
Industry
Petrochemistry and oil refining
Application status
Collection of documents for the stage Banking expertise
Construction of a new gas processing plant
Borrower
Kazakh gas processing plant LLP
Beneficiaries
Government of the Republic of Kazakhstan
Region
Mangystau region
Industry
Petrochemistry and oil refining
Application status
Collection of documents for the stage of Banking expertise
Industrial development of polymetallic ores of the Shalkiya deposit in the Kyzylorda region with the construction of an enrichment plant
Borrower
ShalkiyaZinc LTD JSC
Beneficiaries
National mining company «Tau-Ken Samruk»
Region
Kyzylorda region
Industry
Metallurgical industry
Application status
At the stage «Indicative analysis»
Construction of a high-tech hydrometallurgical plant
Borrower
YERTIS HYDROMETALLURGICAL COMBINE LLP
Beneficiaries
Maaden International Investment
Region
Pavlodar region
Industry
Metallurgical industry
Application status
Collection of documents for the stage Indicative analysis
Construction of a longitudinally welded pipes plant
Collection of documents for stage of Banking expertise
Construction of a group water pipeline to provide drinking water to populated areas of the Turkestan region with a cascade of hydroelectric power stations on the Ugam River
Borrower
Ocean Energy Company LLP
Beneficiaries
Ontustik Financial Commercial and Industrial Corporation LLP (Seitzhanov family), EAST INDUSTRY COMPANY Ltd LLP (Bazarbekuly Baglan and Kozhabekov Nurlan Bazarbekovich)
Region
Turkistan region
Industry
Transport infrastructure
Application status
Collection of documents for the stage Banking expertise
Comprehensive reconstruction of Karaganda International Airport
Kotelnikov Vladimir Mikhailovich, Balaguta Igor Petrovich, Vasiliev Dmitry Vladimirovich, Duskuzhanov Asemkan Serkanovich, Turlykhanov Daulet Bolatovich
Region
Abay region
Industry
Mechanical engineering
Application status
Collection of documents for the stage Indicative analysis
Construction of a 150 MW wind farm in Baidibek district of Turkestan region
Borrower
New Clean Energy LLP
Beneficiaries
Private company «South wind Ltd», beneficiary – Nakipbekov Nurzhan Nurlanovich
Region
Turkistan region
Industry
Energy
Application status
Collection of documents for the stage Indicative analysis
Issue of a bank guarantee of the Development Bank of Kazakhstan JSC for the project "Construction of a combined cycle gas plant with a capacity of 160 MW in Aktau, Mangystau region"
Borrower
Mangystau Nuclear Power Plant LLP
Beneficiaries
The state institution "Department of Finance of the Mangistau region"
Region
Mangystau region
Industry
Energy
Application status
Collection of documents for the stage Indicative analysis
Modernization of boiler unit No. 7 CHPP-1 (using natural gas as fuel)
Borrower
Mangystau Nuclear Power Plant LLP
Beneficiaries
The state institution "Department of Finance of the Mangistau region"
Region
Mangystau region
Industry
Energy
Application status
Collection of documents for the stage Indicative analysis
Construction of the 50 MW Sarkylmas Kuat wind farm
Borrower
Sarkylmas Kuat LLP
Beneficiaries
Nan Yi, Kozhasbai Yerlan Saduakasuly, Zhandosov Oraz Alievich, Nan Haoren, Nan Cunfei
Region
Mangystau region
Industry
Energy
Application status
At the stage of Banking expertise
№
Name of the Project/Operation
Year of signing the Agreement on opening a credit line
DBK participation
Region
Industry
amount of funding, million tenge
Action
1
Pre-export financing
Kyzylorda region
Manufacturing industry
1000
2
Pre-export financing
Shymkent
Manufacturing industry
1600
3
Pre-export financing
Akmola region
Manufacturing industry
1500
4
Pre-export financing
Shymkent
Manufacturing industry
6000
5
Pre-export financing
Almaty region
Manufacturing industry
2160
6
Pre-export financing
Zhetysu region
Manufacturing industry
2500
7
Pre-export financing
West Kazakhstan region
Food industry
1000
8
Pre-export financing
Kostanay region
Food industry
2000
9
Pre-export financing
Petrochemistry and oil refining
27500
10
Pre-export financing
Almaty region
Food industry
7000
11
Pre-export financing
2024
Kostanay region
Food industry
1000
12
Pre-export financing
Zhambyl region
Manufacturing industry
7000
13
Pre-export financing
Shymkent
Manufacturing industry
13000
14
Pre-export financing
Almaty region
Food industry
5000
15
Pre-export financing
Pavlodar region
Metallurgical industry
68000
16
Pre-export financing
Zhetysu region
Food industry
5000
17
Pre-export financing
Almaty
Food industry
3000
18
Pre-export financing
Almaty region
Food industry
1500
19
Pre-export financing
Aktobe region
Manufacturing industry
1700
20
Pre-export financing
East Kazakhstan region
Mechanical engineering
4000
21
Pre-export financing
Almaty region
Agricultural sector
1500
22
Pre-export financing
The Republic of Uzbekistan
The financial sector
9600
23
Pre-export financing
Mangystau region
Chemical industry
3000
24
Pre-export financing
North Kazakhstan region
Food industry
5000
25
Pre-export financing
West Kazakhstan region
Agricultural sector
3000
26
Pre-export financing
West Kazakhstan region
Agricultural sector
1000
TOTAL:
198 460
Pre-export financing
Borrower
Araltuz JSC
Beneficiaries
Salt Industry LLP / Beneficiary: Dauren Mukashev, Ioanna Ponomarenko
Region
Kyzylorda region
Industry
Manufacturing industry
Application status
Approved
Pre-export financing
Borrower
Hill Corporation LLP
Beneficiaries
Kozhamzharov Dulat
Region
Shymkent
Industry
Manufacturing industry
Application status
Collection of documents for the stage of Banking expertise